首页> 美国政府科技报告 >Draft Environmental Impact Statement, San Francisco Bay to Stockton, California Project. John F. Baldwin Ship Channel. Phase II. Central San Francisco Bay Segment
【24h】

Draft Environmental Impact Statement, San Francisco Bay to Stockton, California Project. John F. Baldwin Ship Channel. Phase II. Central San Francisco Bay Segment

机译:环境影响声明草案,旧金山湾至加利福尼亚州斯托克顿项目。 John F. Baldwin船舶航道。第二阶段。中央旧金山湾区

获取原文

摘要

The purpose of this report is to recommend for construction, a plan of improvements for the Central San Francisco Bay segment of the John F. Baldwin Ship Channel. This project is part of the San Francisco Bay to Stockton Project authorized by Congress in 1965. Advanced engineering and design and construction of the John F. Baldwin Ship Channel is proceeding in three phases. Phase I was constructed in 1974 and consists of a Main Ship Channel 55 feet deep and 2000 feet wide across the San Francisco Bay. Phase II, the subject of this report, provides channel improvements in Central San Francisco Bay near Richmond, California. Phase III provides for channel improvements in San Pablo Bay, Carquinez Strait and Suisun Bay to Point Edith. The impetus for channel improvements in Central San Francisco Bay is the worldwide trend toward larger tankers with correspondingly deeper drafts, to transport crude petroleum and a progressive increase in the demand for crude petroleum.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号