首页> 美国政府科技报告 >Applegate Dam Spillway and Outlet Works, Applegate River, Oregon. Hydraulic Model Investigation
【24h】

Applegate Dam Spillway and Outlet Works, Applegate River, Oregon. Hydraulic Model Investigation

机译:applegate Dam溢洪道和出口工程,applegate河,俄勒冈。水力模型研究

获取原文

摘要

The Applegate Dam project, located in southwestern Oregon, provides flood control storage and includes facilities for upstream fish migration and temperature control of normal project releases. This report presents the results of hydraulic model studies used in the final design of the project spillway and flood control outlet. Tests with the spillway model indicated that the originally designed approach channel invert could be raised 20 feet and still maintain satisfactory spillway operation. The reduction in approach-channel depth resulted in a considerable decrease in excavation costs. The model was used to evaluate the performance of the spillway plunge pool. Initial operation of the outlet model revealed the existence of an unacceptable roostertail emanating from the nose of the splitter wall separating the two outlet entrances. The model was used to develop a pier modification which reduced the roostertail to acceptable limits. The report also presents test results used in evaluating performance of the outlet works stilling basin which consists of a unique, dual-chamber hydraulic-jump basin stilling basin which consists of a unique, dual-chamber hydraulic-jump basin which also functions as an entrance pool for the fish passage facility.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号