首页> 美国政府科技报告 >Explosive Expansion Installation Method of Main Propulsion Boiler Tubes
【24h】

Explosive Expansion Installation Method of Main Propulsion Boiler Tubes

机译:主推进式锅炉管爆炸膨胀安装方法

获取原文

摘要

The explosive expansion installation test of main propulsion boiler tubes was successfully completed on 17 August 1983. Five, two inch screen tubes and five, one inch generating tubes in the DDG-15 NAVSSES test boiler were installed using the explosive expansion installation method. Prior to expansion, tube-end protrusions were measured and recorded. After expansion, pertinent measurements were taken to verify proper tube expansion and joint integrity. After additional (and unrelated) repair work was completed on the test boiler, the boiler was hydrostatically tested. Following successful hydro, joint performance will be monitored during and after boiler operations. With successful joint performance, retubing of an active ship's boiler will be proposed using the explosive expansion method. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号