首页> 美国政府科技报告 >Zone Outfitting in a Canadian Great Lakes Shipyard (The First Four Years).
【24h】

Zone Outfitting in a Canadian Great Lakes Shipyard (The First Four Years).

机译:加拿大五大造船厂的区域装备(前四年)。

获取原文

摘要

This paper traces the introduction of Zone Outfitting and Outfit Modules in a Canadian Great Lakes shipyard following ideas put forward at a Washington, D.C. seminar in 1981. Advances made-during construction of five 736' bulk carriers are presented showing the increase in outfit material incorporated in steel units before erection and the rapid increase in size of machinery modules from 3 - 4 tons to some of 40 tons. The different attitudes to these changes by senior management, production supervisors, drawing office and mechanics are briefly examined.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号