首页> 美国政府科技报告 >Product Improvement Program for the M577 Fuze. Volume 4. Redesigned Timer Lever Assembly
【24h】

Product Improvement Program for the M577 Fuze. Volume 4. Redesigned Timer Lever Assembly

机译:m577引信产品改进计划。第4卷。重新设计的定时器杠杆组件

获取原文

摘要

The objective of this project was to design a timer lever assembly which eliminates the lever staff and pallet supports. A design was conceived which combined the aluminum lever staff and pallets supports with the steel lever staff and pallet pins. Because of the required staking operation, the hardness of the lever staff and pallet pins had to be decreased from the current design. Laboratory and environmental testing were performed with satisfactory results. However, after ballistic testing, it was determined the pallet pins were not hard enough to withstand the forces in the 155mm, Zone 8 (203 Charge), weapon without bending and affecting the timing accuracy. This design was then dropped from further consideration.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号