Mitigating Diminishing Manufacturing Sources Material Shortages (DMS/MS) and Obsolescence for the T-6 Canopy Fracturing Initiation System (CFIS).

机译:减少制造资源的减少T-6冠层压裂起爆系统(CFIs)的材料短缺(Dms / ms)和过时。

获取原文

摘要

The Joint Primary Aircraft Training System (JPATS) lost the supplier for its canopy fracturing initiation system (CFIS) with no prospect for a replacement. This forced a complete CFIS redesign to supply both an active production line and sustain fielded aircraft. Compounding the problem, the existing CFIS became obsolete, which forced an interim design to be produced until a final long term solution was fielded. This thesis developed a method to optimize the redesign by determining the lowest cost path for both fielding the interim design and phasing in the final retrofit. Using the Excel Solver (registered trademark) modeling program, an optimal rate was found to expedite interim design introduction and fleet changeover to the final design. The analysis concluded that using achievable stretch goals, existing production capacity could be adjusted to field the final configuration at the lowest cost.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号