首页> 美国政府科技报告 >Performance of Remedial Response, Activities at Uncontrolled Hazardous Waste Sites (REM II) Remedial Investigation First Operable Unit, Rocky Mountain Arsenal Offpost R1/FS Site.
【24h】

Performance of Remedial Response, Activities at Uncontrolled Hazardous Waste Sites (REM II) Remedial Investigation First Operable Unit, Rocky Mountain Arsenal Offpost R1/FS Site.

机译:补救性应对措施的表现,非受控危险废物场所的活动(REm II)补救调查第一可操作单位,落基山阿森纳哨所R1 / Fs场地。

获取原文

摘要

The objective of this remedial investigation (RI) is to evaluate, as part of the first operable unit for site remediation, the nature and extent of contamination as it relates to the existing public water supply wells operated by the South Adams County Water and Sanitation District. A public health endangerment assessment was conducted to identify compounds which could pose a significant health threat. These investigations have identified ground water as the major migration pathway. The six volatile organic chemicals of primary concern are 1,1-DCE, 1,1-DCLE, t-1,2-DCE, 1,1,1-TCE, TRClE, and TClEE. A comprehensive investigation analysis was conducted to (1) characterize the hydrogeologic system and (2) quantify the ground water flow and containment transport processes. A three dimensional ground water flow and containment transfer model was developed and calibrated on a preliminary basis to aid in projection of future TRClE concentrations. This first operable unit RI report is not in intended to address the identity of contributing sources or their relative contributions to the contamination.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号