首页> 美国政府科技报告 >Litigation Technical Support and Services, Rocky Mountain Arsenal. Building 1727 Sump, Interim Response Action Assessment, Task 30, Draft Final Treatability Study.
【24h】

Litigation Technical Support and Services, Rocky Mountain Arsenal. Building 1727 Sump, Interim Response Action Assessment, Task 30, Draft Final Treatability Study.

机译:Rocky mountain arsenal的诉讼技术支持和服务。建立1727 sump,临时响应行动评估,任务30,最终可处性研究草案。

获取原文

摘要

Based on the literature review, electrochemical precipitation and activated alumina adsorption were judged to be the most promising technologies for interim treatment of wastewater in Sump 1727. Sections of the report discuss the following: (1) Raw water characteristics; (2) proposed treatment levels for discharge to the RMA sanitary sewer; (3) treatability test methods that were used to evaluate the two technologies; (4) results of the tests; (5) selection of alumina as the preferred treatment; (6) conceptual design; and (7) costs. jg.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号