首页> 美国政府科技报告 >Environmental Assessment, Water Control Structure Improvements in Mississippi River Pools 20 and 21, River Miles 347 to 350 and 332 to 333, Lewis Country, Missouri and Hancock County, Illinois.
【24h】

Environmental Assessment, Water Control Structure Improvements in Mississippi River Pools 20 and 21, River Miles 347 to 350 and 332 to 333, Lewis Country, Missouri and Hancock County, Illinois.

机译:环境评估,密西西比河流域20和21,河流里程347至350和332至333,刘易斯国家,密苏里州和伊利诺伊州汉考克县的水控结构改进。

获取原文

摘要

The U.S. Army Corps of Engineers, Rock Island District, is responsible for maintaining the Mississippi River Nine-Foot Channel Navigation Project in Pools 11 to 22. A navigation channel depth of 9 feet minimum must be maintained from early spring to winter for commercial towboat traffic. The 9-foot depth is basically maintained by the series of locks and dams along the river. The river, however, is still in a semi-natural condition in terms of sediment (bedload) transportation. At times, this sediment accumulates at various locations in the navigation channel and must be removed by dredging in order to prevent channel closure and stoppage of commercial traffic. Sometimes this shoaling (sediment accretion) happens so rapidly that emergency dredging is required to reopen the channel where towboats run aground. The purpose of these structures is to direct the flow of water away from shorelines, side channels, etc., and into the main channel. Basically, these structures constrict the river flow into a more narrow cross section. This reduced cross section causes the water velocity to increase and subsequently to transport more sediment. (sdw)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号