首页> 美国政府科技报告 >Definite Project Report for Section 14. Emergency Streambank Protection, Sangamon River Sewage Treatment Facility, Riverton, Illinois. Revision
【24h】

Definite Project Report for Section 14. Emergency Streambank Protection, Sangamon River Sewage Treatment Facility, Riverton, Illinois. Revision

机译:第14节的确定项目报告。伊利诺伊州里弗顿的sangamon河污水处理设施紧急城市群保护。调整

获取原文

摘要

This report addresses the problem of streambank erosion at the junction of Sangamon Creek and the Sangamon River, at the village of Riverton, Illinois, Sewage Treatment Facility. The erosion is seriously affecting the streambank in the area of th effluent discharge outfall. The proposal for emergency streambank protection presented in this report recommends channel relocation along with placement of riprap along approximately 230 linear feet of the left descending bank and along 60 linear feet of the right descending bank of Sangamon Creek, including portions of the right descending bank of the Sangamon River. The total estimated cost for the project is $57,100, with a benefit-to-cost ratio of 2.5. The project satisfies the criteria for Federal participation and is recommended for construction.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号