Fully Burdened Cost of Retrograde, Redeployment, Reconstitution, and Reset and Analysis of Alternatives (FBCR4 & AoA): New Model to Formulate Strategic Decisions for Deployed Ground Vehicle Equipment.

机译:逆向,重新部署,重建和重置以及替代品分析的全负担成本(FBCR4和aoa):为部署的地面车辆设备制定战略决策的新模型。

获取原文

摘要

The retrograde cost for Afghanistan is complex and involves many uncertainties, yet it is a part of military operations when nations go to war. This report introduces the fully burdened cost of retrograde, redeployment, reconstitution, and reset and analysis of alternatives (FBCR4 & AoA) as an estimating tool that can be used to analyze many of the different variables included in bringing equipment home. The tool can be tailored for future major retrogrades. The distinctive characteristic of this tool, in comparison to conventional estimating tools, is that it aggregates all major activities while synchronizing data from multiple DoD agencies. The primary objective of this report is to aggregate the numerous variables, fees, and constraints of R4 for any combat theater to contemporaneously assist in executing the Commandant's strategy while informing key leadership of critical R4 cost analysis. The second objective is to equip DoD planners with the framework for solving retrograde dilemmas in future conflicts. By conducting the FBCR4 process for vehicles, the researchers developed an estimated cost of 63 percent of the vehicle's original procurement cost. Our analysis of the data gathered also indicates a total estimated cost savings of $139.8M by selling all M-ATVs to foreign allies.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号