首页> 美国政府科技报告 >Alignment of Manpower Requirements with Procurement Workload
【24h】

Alignment of Manpower Requirements with Procurement Workload

机译:人力需求与采购工作量的一致性

获取原文

摘要

U.S. Army Materiel Command Major Subordinate Commands (MSCs) are failing to accomplish their Procurement Appropriation Army (PAA)-Secondary obligation plans and are experiencing significant increases in Procurement Administrative Lead Time (PALT). A PALT computer simulation model was developed for determining Procurement and Production Directorate (PPD) manpower requirements based upon procurement workload and other factors which might improve overall contract execution performance at one MSC, U.S. Army Missile Command (MICOM). It was found current MICOM PPD manpower allocation may be suboptimal. An algorithm was developed for realigning manpower to reduce average Procurement Work Directive PALT and procurement backlog. Future manpower reallocations should be simulated with dedicated computer resources to arrive at an optimal manpower realignment. A preliminary evaluation of the applicability of the MICOM model to other MSCs is made, with a more complete evaluation to be based on future analyses. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号