首页> 美国政府科技报告 >Contamination Assessment Report, Site 36-8, Chemical Drainage Ditch. Phase 1. Version 3.2.
【24h】

Contamination Assessment Report, Site 36-8, Chemical Drainage Ditch. Phase 1. Version 3.2.

机译:污染评估报告,site 36-8,化学排水沟。阶段1.版本3.2。

获取原文

摘要

This final report documents the phase I contamination survey of the site 36-8 two open chemical drainage ditches. 10 samples from 4 borings were analyzed for volatile and semivolatile organics and metals with separate analyses for As, Hg, and DBCP. As, Hg, Dieldrin, and DIMP were detected at or above their respective indicator ranges. A phase II program consisting of 25 additional boring is recommended. The volume of potentially contaminated material is estimated at 12,000 cubic yards. Appendices include chemical names, phase I chemical data, and comments and responses. -BKA.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号