The objective of this interim response action is to correct a hydraulic imbalance in the North Boundary treatment and recharge system. Ten gravel filled recharge trenches will be constructed along the downgradient side of the slurry wall. This draft final decision document provides summaries of: (1) alternatives considered; (2) significant events leading to the initiation of the IRA; (3) the IRA project; and (4) the applicable or relevant and appropriate requirements, standards, criteria, or limitations (ARAR'S) associated with the program. Comments and responses are found in the appendix.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号