首页> 美国政府科技报告 >Maintenance Management of U.S. Army Railroad Networks - The RAILER (Railroad Maintenance Management System) System: Component Identification and Inventory Procedures
【24h】

Maintenance Management of U.S. Army Railroad Networks - The RAILER (Railroad Maintenance Management System) System: Component Identification and Inventory Procedures

机译:美国陆军铁路网络的维护管理 - RaILER(铁路维护管理系统)系统:组件识别和库存程序

获取原文

摘要

The U.S. Army Construction Engineering Research Laboratory (USA-CERL) is developing the Railroad Maintenance Management System (RAILER) as a comprehensive program for track inventory, inspection, maintenance, and repair. The Army previously had no standard, systematic approach to maintaining trackage on its installations. When RAILER is completed and field-tested successfully, it will be available to installations for (1) locating and identifying physical assets, (2) assessing conditions, (3) determining maintenance and repair (M&R) needs, and (4) planning M&R work. This report describes the first phase of RAILER--location and identification of physical assets. This phase is fundamental to any level of implementation for the system. Procedures are described for dividing installation railroad track networks into specific tracks and track segments. A location reference system is explained with examples and illustrations provided. Finally, this volume identifies major inventory data elements and important element attributes needed for maintenance management along with methods of data collection. Future technical reports will describe track inspection procedures; the development of interim railroad maintenance procedures; a project prioritization method; track evaluation procedures; finalized railroad maintenance management practices using RAILER; and long-range work planning. (SDW)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号