首页> 美国政府科技报告 >Analysis of the Pile Load Test Program at the Lock and Dam 26 Replacement Project
【24h】

Analysis of the Pile Load Test Program at the Lock and Dam 26 Replacement Project

机译:锁坝26更换工程桩荷载试验方案分析

获取原文

摘要

Prior to performing twenty-eight axial and two lateral load tests on piles at Mississippi the Lock and Dam 26 project, an in situ test program was conducted. The program consisted of four cone penetration tests, twelve pressuremeter test borings, and four standard penetration test borings. Comparisons of pile capacity predictions were made for each of the in situ test methods. The initial study generated four reports and voluminous test data. This is a summary of those reports. (fr)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号