Industrial Technology Modernization Program. Project 44. Modernize Facility Equipment and Processes. Volume 1. Revision 2. Phase 2

机译:工业技术现代化计划。项目44.现代化设施设备和流程。第1卷。修订2.第2阶段

获取原文

摘要

The fabrication task will be divided between four functional departments 1) metal finishing, 2) flexible machining, 3) tool model/short runshop and 4) dedicated machining. Each area will handle a special work task either supporting other fabrication activities or reacting to special volume/set up needs. Order schedules will be handled by the MAP system, critical resources management is directed by the CRP module and timely procurement of material is the responsibility of the PMC (Purchase Material) Module. Some reserve capacity is maintained to handle must have jobs . Metal finish will support all other slip with coating and finish processing, while flexible machining will handle moderate/high volume parts that do not pass machine utilization thresholds. The tool model/short run slip will handle low volume/high set up needs and provide back up to the flexible shops. High volume precision parts will process across the dedicated machining cell. Keywords: Machining workcells, CNC machining. (sdw)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号