首页> 美国政府科技报告 >Implementation Document for Ira to Improve the North Boundary System Via Construction of Groundwater Recharge Trenches.
【24h】

Implementation Document for Ira to Improve the North Boundary System Via Construction of Groundwater Recharge Trenches.

机译:艾拉通过建设地下水补给沟改善北界系统的实施文件。

获取原文

摘要

This interim response action is an upgrade of the treated ground water recharge system associated with the North Boundary containment/treatment system. In order to correct an hydraulic imbalance, ten gravel filled recharge trenches were constructed along the downgradient side of the barrier. Water is piped underpressure from the treatment plant through a new effluent pipe to the trenches. This should increase recharge capacity by 150 gallons per minute. The implementation plan includes the following: Mou between the army and shell concerning the North Boundary trenches IRA; Scope of work; Construction work plan; Cost estimate - $490,000; Engineering specifications and engineering drawings, and schematics. (AN).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号