首页> 美国政府科技报告 >Structural, Material, and Geotechnical Solutions to Levee and Floodwall Construction and Retrofitting - Physical Modeling.
【24h】

Structural, Material, and Geotechnical Solutions to Levee and Floodwall Construction and Retrofitting - Physical Modeling.

机译:堤坝和防洪堤施工和改造的结构,材料和岩土工程解决方案 - 物理模型。

获取原文

摘要

This report presents the evaluations of two retrofitting methods for levees and floodwalls. Physical modeling in a centrifuge was used in testing the effectiveness of floodwall panel joint caps (or clips ) and a gap filler. The clip connectors were U-shaped reinforced polymers with various thicknesses and strengths, mounted over the joints between I-wall panels. The expectation was that the clips would improve the overall performance of the wall if the panels were connected and behaved as a single unit. The second retrofit method evaluated what was called the gap filler, which was a mixture of sand and bentonite. The mixture was entrenched along the levee along the riverside of a sheet wall. The belief was that as water pressure on the wall caused the wall to move (or rotate) toward the landside of the levee; the filler would drop down into the gap and expand, thus reducing seepage under the wall. All test models were constructed, then placed on the centrifuge platform and subjected to various flood conditions representing those experienced during Hurricane Katrina.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号