首页> 美国政府科技报告 >Evaluation of the Air Force as a Design and Construction Agent in the Military Construction Program
【24h】

Evaluation of the Air Force as a Design and Construction Agent in the Military Construction Program

机译:空军作为军事建设项目设计和施工代理人的评价

获取原文

摘要

This case study examines two Air Force civil engineering organizations managing MCP projects in lieu of the Corps of Engineers. Cost savings, increased responsiveness to users, improved facility design and architectural compatibility, lower contract modification rates and the ability to incorporate changes more easily to accommodate mission changes were some of the advantages found in the Air Force managed programs. Some of the key management initiatives responsible for the successful program at both organizations include: establishment of an independent MCP Management Office, collocation of contracting with engineering personnel, hiring of technical expertise, cradle-to-grave project management and the employment of the team concept with a multi-disciplined engineering staff to manage projects. Keywords: Military construction, Military procurement, Air Force procurement, Construction, Theses. (jes)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号