首页> 美国政府科技报告 >Systems Engineering Approach to Define the Fundamental Process for Phase 0/Steady State Theater-Level Strategic Assessments.
【24h】

Systems Engineering Approach to Define the Fundamental Process for Phase 0/Steady State Theater-Level Strategic Assessments.

机译:系统工程方法定义阶段0 /稳态剧院级战略评估的基本过程。

获取原文

摘要

This thesis describes a functional framework for developing strategic assessment at the Combatant Command level, specifically European Command. The framework establishes a functional architecture based on derived requirements and objectives according to the systems engineering process described by Dennis Buede. This thesis describes the current methodology for developing theater plans based on the national strategies established by the President, Secretary of Defense and Chairman of the Joint Chiefs of Staff. In addition, it provides an analysis of the system stakeholders in order to define the purpose and utility of a strategic assessment from various perspectives. Based on this analysis, the requirements and functions of the system are decomposed and arranged according to a hierarchy via Vitech's CORE 8 University Edition. Finally, the developed model is tested against a notional scenario that assesses a fictional exercise according to the derived functional model, in order to demonstrate the methodology used to relate activities to strategic goals. This thesis defines the framework for conducting strategic assessments and leveraging them to maximize the impact of U.S. activities.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号