首页> 美国政府科技报告 >Remotely Piloted Vehicle (RPV) Two versus Three Level Maintenance Support Concept Study
【24h】

Remotely Piloted Vehicle (RPV) Two versus Three Level Maintenance Support Concept Study

机译:远程驾驶车辆(RpV)二级与三级维护支持概念研究

获取原文

摘要

Two maintenance support concepts for selected RPV subsystems lifetime supply and maintenance (S&M) costs are: 1) two levels of support, organizational and depot; and 2) three levels of support, organizational, intermediate (direct support and general support) and depot. Lifetime costs applicable to current peacetime conditions are estimated through the method of the Optimum Supply and Maintenance Model (OSAMM) which uses the supply model called Selected Essential-Item Stockage for Availability Method (SESAME), as a subroutine. The unique features of OSAMM allows it to simultaneously minimize costs, develop maintenance task distributions, and quantities and placement of test equipment and stockage while achieving a pre-stated operational availability target. Results are presented over a range of operational availability values of interest in which supply quantities are variants. It is concluded that the three level support concept is less expensive than the two level concept for every selected subsystem studied except one - that one exception has a small cost impact. Another interesting conclusion reached for the three level concept is that the operational availability can be significantly improved with small stockage cost increases. Keywords: Aircraft maintenance; Life cycle costs; Cost estimates. (edc)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号