首页> 美国政府科技报告 >Stress Analysis Report for the Microwave Landing System (MLS) Class V Modification C-130 Aircraft
【24h】

Stress Analysis Report for the Microwave Landing System (MLS) Class V Modification C-130 Aircraft

机译:微波着陆系统(mLs)V级改造C-130飞机的应力分析报告

获取原文

摘要

Contents: Structural Loading Criteria; Summary of Minimum Margins of Safety; Analysis; Unoccupied Areas; Receiver Installation Models C-130E/H, WC-130E/H, HC-130H/N/P; Data Bus Coupler/Signal Splitter Installation Models C-130E/H, WC-130E/H, HC-130H/N/P; Receiver/Data Bus Coupler Installation Model C-130B; Signal Splitter/Relay Panel Installation Model C-130B; Front Antenna Installation; AFT Antenna Installation; AFT Antenna Installation; AFT Pressure Feed-Thru; Crew Occupied Areas; Top Antenna Installation; Relay Panel Installation; Relay Panel - Models C-130E/H/B; Relay Panel - Models C-130H (Late); Relay Panel - Models HC-130H/N/P, WC-130E/H; Forward Pressure Feed-Thru. (fr)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号