首页> 美国政府科技报告 >Dynamic Loading on Sidewall Monoliths of a Spillway Stilling Basin: Hydraulic Model Investigation
【24h】

Dynamic Loading on Sidewall Monoliths of a Spillway Stilling Basin: Hydraulic Model Investigation

机译:溢洪道消力池侧壁整体结构的动态加载:水力模型研究

获取原文

摘要

Guidance for determining the magnitude of hydraulic forces acting on a stilling basin sidewall is presented. A designer knowing the unit discharge, spillway height, velocity entering the stilling basin, Froude number, sequent depth, and tailwater depth can compute the average hydraulic force and maximum pulsations for any increment of sidewall length. The maximum overturning moment about the base of any portion of the sidewall can also be determined. Appendix A presents an example problem illustrating the recommended application for estimating the magnitudes and locations of the resultant dynamic forces acting on a stilling basin sidewall.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号