首页> 美国政府科技报告 >Santa Ana River Design Memorandum Number 1. Phase 2. GDM (General Design Memorandum) on the Santa Ana River Mainstem, Including Santiago Creek. Volume 6. Santiago Creek
【24h】

Santa Ana River Design Memorandum Number 1. Phase 2. GDM (General Design Memorandum) on the Santa Ana River Mainstem, Including Santiago Creek. Volume 6. Santiago Creek

机译:santa ana River设计备忘录编号1.第2阶段:santa ana River mainstem的GDm(通用设计备忘录),包括santiago Creek。第6卷。圣地亚哥河

获取原文

摘要

This volume accompanies the main report and supplemental environmental impact statement for the Phase II General Design Memorandum for the Santa Ana River Mainstem including Santiago Creek and contains the general design for the Santiago Creek. The recommended plan for Santiago Creek consists of modifying the existing gravel pits for flood control storage, constructing an outlet structure from the gravel pits with a release capacity of 3500 cu ft/s and constructing a riprapped channel between the Santa Ana Freeway and the confluence with the Santa Ana River. The 5.5 miles of creek between the outlet structure and channel in the vicinity of Walnut Avenue to the beginning of the riprapped channel south of the Santa Ana Freeway would not be improved and would be managed by the local sponsor in accordance with FEMA guidelines. Keywords: Drainage area; Water conservation pool; Flood control storage; Riprap channel; Relocations; Hydraulics; Santa Ana River Basin; California. (edc)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号