首页> 美国政府科技报告 >Compliance Testing of Eielson AFB (Air Force Base) Central Heating and Power Plant, Coal-Fired Boiler Number 4, Eielson AFB, Arkansas.
【24h】

Compliance Testing of Eielson AFB (Air Force Base) Central Heating and Power Plant, Coal-Fired Boiler Number 4, Eielson AFB, Arkansas.

机译:Eielson aFB(空军基地)中央供暖和发电厂,燃煤锅炉4号,Eielson空军基地,阿肯色州的符合性测试。

获取原文

摘要

At the request of HQ 343 CSG/DEEV and HQ AAC/SGPB, source compliance testing (particulate and visible emissions) of Boiler No 4 in the Eielson AFB Central Heating and Power Plant was conducted on 7-15 June 1989. Testing was performed to determine compliance with regards to the renewal of Alaska Department of Environmental Conservation Air Quality Control Permit to Operate 8331-AA001. Boiler No. 4 was tested on 12 and 14 Jun 89. On 12 June results indicated that visible emissions standards were met; however, particulate emissions standards were not met. The boiler was retested on 14 June and all emissions standards were met. All emission requirements for permit renewal have now been met. Keywords: Compliance testing; Stack sampling; Stack emissions; Particulates; Source emission testing, Opacity; Air pollution. (jes)

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号