首页> 美国政府科技报告 >Technology Insertion-Engineering Services Process Characterization, Task Order Number 1. Volume 5. Revision A.
【24h】

Technology Insertion-Engineering Services Process Characterization, Task Order Number 1. Volume 5. Revision A.

机译:技术插入 - 工程服务流程特征,任务订单号1.第5卷。修订版a.

获取原文

摘要

During the 4th quarter of FY89, the contractor (MDMSC), completed process characterization of seven Resource Control Centers (RCCs). The purpose of this process characterization was to accomplish an engineering assessment and determine an As-Is baseline description of RCC operations, from which improvements could be measured. The data gathered during the process was used to drive a stochastic simulation model of the RCC, using the UDOS 2.0 model developed for this contract. Three of the RCCs characterized are in the Technology Repair Division (MAT) and four are in the Aircraft Division (MAB). The process characterization was performed as a part of the Technology Insertion-Engineering Services (TI-ES) program and was completed in three separate activity blocks as part of Task Order no. 1: Block 1 -- MATPGB, MATPSI, MATPSS, Block 2, MABPSA, MABPSB, MABPSP, and Block 3 MABPSC. This contract summary report addresses the seven RCCs characterized in Task Order no. 1 of the TI-ES contract, describes processes observed during data collection, and discusses results of experimentation with the UDOS 2.0 simulation model. This Technology Insertion (TI)/Industrial Process Improvement (IPI) summary report for SA-ALC contains focus study and quick fix recommendations for 7 RCC's. These RCC's are: MABPSA, MABPSB, MABPSP, MATPGB, MATPSI, and MATPSS.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号