首页> 美国政府科技报告 >Study of Breakwaters Constructed with One Layer of Armor Stone, Detroit District. Repair, Evaluation, Maintenance and Rehabilitation Research Program.
【24h】

Study of Breakwaters Constructed with One Layer of Armor Stone, Detroit District. Repair, Evaluation, Maintenance and Rehabilitation Research Program.

机译:底特律地区用一层装甲石建造防波堤的研究。维修,评估,维护和康复研究计划。

获取原文

摘要

This study was carried out to provide documentation of the design, construction, repair, rehabilitation, maintenance, environmental loading, and economic history of one layer armor-stone breakwaters in the US Army Engineer District, Detroit, and to present cost comparisons for one-layer stone breakwaters versus two-layer stone breakwaters. The US Army Engineer District (USAED), Detroit, has 16 breakwaters within the District, all or part of which were designed and constructed with one layer of armor-stone protection. (This type of construction was used between 1918 and 1975.) This study was carried out to document the design, construction, repair, rehabilitation, maintenance, environmental loading, and economic history for these structures. Five of the sixteen harbors were selected for cost studies to compare cost to construct the breakwater today using a one-layer design (as it was constructed) with cost using a two-layer design. Maintenance costs for the 16 breakwaters with one layer of armor stone also were compared with maintenance costs for typical breakwaters constructed with two layers of armor stone. (JES)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号