首页> 美国政府科技报告 >Sedimentation Solutions for Military Ocean Terminal Sunny Point (MOTSU), North Carolina.
【24h】

Sedimentation Solutions for Military Ocean Terminal Sunny Point (MOTSU), North Carolina.

机译:北卡罗莱纳州军事海运码头sunny point(mOTsU)的沉积解决方案。

获取原文

摘要

The US Army's Military Ocean Terminal Sunny Point (MOTSU) went into service in 1955, and serves as a military munitions terminal. The facility is located in Brunswick County, North Carolina, approximately 10 miles upstream of the mouth of the Cape Fear River. Shoaling issues have been a problem since the opening of the port. The objective of this work is three fold: reduce long term dredging costs, achieve operational readiness goals, and maintain or enhance environmental quality at MOTSU at the request of US Army Engineer District- Wilmington (USAED-SAW). The objective was achieved through numerical modeling, literature review, and sediment forecasting. This report documents the results of the numerical modeling study only. Two advantageous approaches for shoaling mitigation are recommended for further analysis, and those solutions could be combined to achieve an optimum dredging-reduction scheme. It is concluded that by integrating multiple solutions it is possible to create a cost-effective long-term shoaling-mitigation plan.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号