首页> 美国政府科技报告 >Technology Insertion Engineering Services Process Characterization Task Order No. 1. (Block II). Database Documentation Book for OC-ALC MATPCA.
【24h】

Technology Insertion Engineering Services Process Characterization Task Order No. 1. (Block II). Database Documentation Book for OC-ALC MATPCA.

机译:技术插入工程服务过程表征任务第1号命令(第二组)。 OC-aLC maTpCa数据库文档手册。

获取原文

摘要

MATPCA is separated into two sections, each having its own workload and personnel. The two sections are physically separated by an eight foot isle which runs between them. The two sections share storage cabinets and some test equipment, but otherwise exist as separate entities, each having its own supervisor. Workloads appear to be divided equitably based on existing staffing. The first section's workload consists mostly of ignition exciters, temp. probes, electrically actuated valves, and associated electrical accessories. The work area is somewhat crowded with test equipment and work benches, much of which is not being utilized due to the present workload levels. The existing facilities would be capable of processing a much greater workload given the needed staffing. This section contains 6,250 square feet of floor space. The second section's workload is mostly made up of temperature amplifiers, servo-motors, and power supplies. Again, the area contains several benches and and testing equipment which is not being utilized at their full potential given the present workload. The section contains 2,875 square feet of floor space. Note that MISTR items are normally delivered to an outside storage area in building 3123. Technicians normally are sent to this area once a week to uncrate accessories and load them onto a transport trailer. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号