首页> 美国政府科技报告 >Upper Mississippi River System, Environment Management Program, Definite ProjectReport with Integrated Environmental Assessment (R-8). Bay Island, Missouri Rehabilitation and Enhancement. Pool 22, Mississippi River Miles 311 through 312, Marion County, Mi
【24h】

Upper Mississippi River System, Environment Management Program, Definite ProjectReport with Integrated Environmental Assessment (R-8). Bay Island, Missouri Rehabilitation and Enhancement. Pool 22, Mississippi River Miles 311 through 312, Marion County, Mi

机译:密西西比河上游系统,环境管理计划,具有综合环境评估的确定项目报告(R-8)。海湾岛,密苏里州的康复和增强。游泳池22,密西西比河里程311至312,马里恩县,密苏里州

获取原文

摘要

The Bay Island complex, encompassing approximately 650 acres of aquatic, wetland,and terrestrial habitat, is located on the Missouri side of the navigation channel between river miles (RM) 311 and 312, approximately 1 mile north of the city of Hannibal (see plate 2). The quality, extent, and diversity of this area's wetland habitat is rapidly decreasing. The migratory waterfowl and other wetland species which currently depend upon and utilize this habitat type for resting and feeding, as well as reproduction and brooding, are being adversely affected by its declining availability. Pool 22 and its environs currently lack sufficient wetland habitat to maintain the levels of waterfowl, shorebird, and furbearer use previously experienced in this area. Prior to establishment of the extensive system of agricultural drainage districts adjacent to this pool, prime forested wetlands were readily available throughout the area during annual migrations. Recognition of an ongoing loss of quality wetlands along this reach of the river prompted the development of the Bay Island project for waterfowl habitat enhancement. (jes)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号