首页> 美国政府科技报告 >Report of Field Investigations Assessment and Proposed Decision Document for theNorthwest Boundary System, Short-Term Improvements, Interim Response Action, RMA
【24h】

Report of Field Investigations Assessment and Proposed Decision Document for theNorthwest Boundary System, Short-Term Improvements, Interim Response Action, RMA

机译:西北边界系统的现场调查评估和拟议决策文件报告,短期改进,临时响应行动,Rma

获取原文

摘要

Recent field investigations identified a small alluvial channel immediatelynortheast of the existing Northwest Boundary System (NWBS) that provides a pathway for ground water to flow around the slurry wall. Samples from this channel contained dieldrin at levels above the ARAR's for the north boundary system. The objective of the Northwest Boundary System short term improvements interim response action is to mitigate the bypass of contaminated alluvial ground water by extending the NWBS. The extension is to utilize methods employed to construct the existing system (dewatering wells, recharge wells, and/or a slurry wall). The treatment of extracted ground water will be performed by the existing treatment plant. This combined assessment and decision document provides information on: (1) Field investigations including borelogs and grain size reports; (2) Hydrogeology of the area; and (3) Ground water quality and level. (MM).

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号