In cost-plus fixed fee contracts, the contractor is paid based on the actualcosts incurred plus some graded incentive fee, rather than on a fixed bid. The larger the project, the more critical it becomes to ensure that the impact of all schedule changes be efficiently analyzed, so that the contractor can complete intermediate milestones as well as the entire project on time. Commercially available scheduling software does perform many of the necessary analyses, but cannot filter data in ways that are useful to schedule reviewers. In planning large projects, there is an acute need for supplemental software that can process scheduling data to make it immediately useful to schedule reviewers. The PROMAN (PROject MANagement) microcomputer-based schedule analysis software was developed by the U.S. Army Construction Engineering Research Laboratory (USACERL) to provide several tools to help evaluate progress of the construction project, to assess the impact of schedule changes upon the project, and to provide other assistance in construction schedule management. In this study, PROMAN was employed on a large cost-plus project undertaken by the Corps of Engineers in the construction of the National Test Facility (NTF) in Colorado Springs, CO. (kr)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号