首页> 美国政府科技报告 >Effect of Extension in System Technology on Contractor Costs and ProductionSchedules during the Procurement of Air-Launched Tactical Munitions
【24h】

Effect of Extension in System Technology on Contractor Costs and ProductionSchedules during the Procurement of Air-Launched Tactical Munitions

机译:空投战术弹药采购过程中系统技术推广对承包商成本和生产计划的影响

获取原文

摘要

This thesis investigates relationships between extensions in technology and bothcost and schedule slippages in the development and production phases of weapons system acquisition. The primary objective is to determine if the amount of technology embodied in a given weapons system can be employed to predict a Department of Defense (DoD) contractor's performance in meeting cost and schedule targets. The analysis used a sample of 15 U.S. military tactical air-launched munitions systems. It begins with a review of the literature regarding technology measurement and its connection to cost and schedule outcomes. Next, measures of technological progress are developed and displayed. Third, the process of creating cost growth and schedule slippage measures are discussed. The relationships between technological complexity and cost and schedule outcomes are then empirically tested. Major findings indicate that measures of extension in technology are worthwhile for explaining production and total program cost growth.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号