首页> 美国政府科技报告 >National Shipbuilding Research Program, 1990 Ship Production Symposium, Paper No. 3A-2: Index Based Management Information Systems: A Study in Structured Operations.
【24h】

National Shipbuilding Research Program, 1990 Ship Production Symposium, Paper No. 3A-2: Index Based Management Information Systems: A Study in Structured Operations.

机译:国家造船研究计划,1990年船舶生产研讨会,第3a-2号文件:基于指数的管理信息系统:结构化运作研究。

获取原文

摘要

In any job, project, program, or complex undertaking there exists a need to understand all aspects of the work. This understanding is necessary to satisfy all requirements in the most effective and efficient way. The methods available to plan and accomplish these tasks are as vary as much as the tasks themselves. They range from job shop techniques to Material Requirements Planning (MRP) to Project-Based Management Information System (PBMS) to continuous manufacturing. This paper is a critical analysis aimed at classifying two of these system approaches as they relate to the ship repair equation. Material Requirements Planning (MRP I) tracks a need for material through a project. The production process on the material determines how labor is applied to transform raw materials into finished products. MRP material needs are determined by sales forecasting; while requirements are determined algorithmically from material take-offs. Another form is Manufacturing Resource Planning (MRP II). This form of MRP is a management process, supported by computers, which results in monthly production plans based outlooks, etc., and is far sales more comprehensive in scope and integration than MRP I.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号