首页> 美国政府科技报告 >Rocky Mountain Arsenal, Sanitary Sewer Interim Response Action, ConstructionDocuments for New Sanitary Sewer Construction. Volume 2
【24h】

Rocky Mountain Arsenal, Sanitary Sewer Interim Response Action, ConstructionDocuments for New Sanitary Sewer Construction. Volume 2

机译:落基山阿森纳,卫生下水道临时应对行动,新卫生下水道建设的建设文件。第2卷

获取原文

摘要

The primary objective of this interim response action is to prevent the potentialspread of contamination via the sanitary sewer system. The IRA will consist of (1) Construction of a new sanitary sewer, and (2) Sealing of the existing sewer in the north plants and south plants areas along with the interceptor line in section 36. Sections and appendices of this final implementation plan include: (1) Background and overview of course of action; (2) Procedures for sealing the existing sewer lines with concrete; (3) Schedule of closure events; (4) Health and safety plan for closure of existing lines; (5) Specifications and plans for the new sanitary sewer; (6) Chemical, physical, and biological properties of contaminants; and (7) Request for proposals.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号