首页> 美国政府科技报告 >Improvement of Operations and Maintenance Techniques Research Program. Evaluation of an Experimental Jet Fluidizer for Removal of Sand Waves in the Columbia River. Report 2. 1988 Exercise.
【24h】

Improvement of Operations and Maintenance Techniques Research Program. Evaluation of an Experimental Jet Fluidizer for Removal of Sand Waves in the Columbia River. Report 2. 1988 Exercise.

机译:改进运营和维护技术研究计划。用于去除哥伦比亚河中沙波的实验喷射流化器的评估。报告2. 1988年演习。

获取原文

摘要

An experimental jet fluidizer for the removal of sand waves in the Columbia River navigation channel. The performance of this jet fluidizer is being evaluated and reported on in a series of reports. Report 1 of this series presents design details and results of the first dredging exercise that took place September-October 1987. Although the fluidizer proved successful at removing the specified sand wave volumes, recommendations were made for improving the fluidizer efficiency and reducing the unit cost per cubic yard of material removed. This report describes the modifications that were made to the fluidizer dredge and evaluates the field performance for the second dredging exercise that took place September-October 1988.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号