首页> 美国政府科技报告 >Full-Scale Incineration System Demonstration at the Naval Battalion ConstructionCenter, Gulfport, Mississippi. Volume 6. Project Management/Site Services
【24h】

Full-Scale Incineration System Demonstration at the Naval Battalion ConstructionCenter, Gulfport, Mississippi. Volume 6. Project Management/Site Services

机译:密西西比州格尔夫波特海军营建筑中心的全面焚烧系统示范。第6卷。项目管理/现场服务

获取原文

摘要

The demonstration program consisted of three phases. The first phase, theVerification Test Burn, demonstrated the effectiveness of the 100 ton/day incinerator to destroy soil contaminated with constituents of HO, in particular 2,3,7,8-tetrachlorinated dibenzo dioxin (2,3,7,8-TCDD). The second phase demonstrated the ability of the incinerator to meet the requirements of the Resource Conservation and Recovery Act (RCRA) of 1976, as amended, which specifies that the incinerator must meet or exceed a Destruction and Removal Efficiency of 99.9999%. The third phase determined the cost and reliability of using the incineration on a long-term basis. This report summarizes the daily activities during operations at the NCBC and the Idaho National Engineering Laboratory (INEL) project management oversight.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号