首页> 美国政府科技报告 >Offpost Operable Unit Endangerment Assessment/Feasibility Study. Revised Draft.Volume 1. Introduction
【24h】

Offpost Operable Unit Endangerment Assessment/Feasibility Study. Revised Draft.Volume 1. Introduction

机译:前哨可操作单位濒危评估/可行性研究。修订草案。体积1.简介

获取原文

摘要

An Endangerment Assessment was performed for the Offpost Operable Unit (OU) ofRocky Mountain Arsenal (RMA). The Offpost OU consists of 27 square miles located to the north and northwest of RMA. It is currently characterized by rural agricultural and residential land uses, with some industrial land use. In the future, land use is projected to change to more commercial, industrial, and recreational land use in areas adjacent to RMA, with some areas zoned for residential development. For these reasons, a rural residential scenario (including agriculture), a commercial/industrial scenario, and a recreational scenario were evaluated. An ecological assessment was also performed, due in part to the bald eagle habitat and other sensitive environments in the Offpost OU. The major steps performed in the EA included data evaluation, identification of chemicals of potential concern, exposure assessment, toxicity assessment, human risk characterization, and ecological assessment.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号