首页> 美国政府科技报告 >Investigation of Project Management Techniques for Scheduling RAAF Depot LevelMaintenance
【24h】

Investigation of Project Management Techniques for Scheduling RAAF Depot LevelMaintenance

机译:RaaF车辆段维修调度项目管理技术研究

获取原文

摘要

This research investigates scheduling performances of commercial projectmanagement software. It is based on difficulties that the Royal Australian Air Force experienced in evaluating microcomputer-based packages in maintenance task scheduling of aircraft undergoing Depot Level Maintenance. A literature review found only one paper quantifying commercial software performances. No standard performance metrics or test data were found. Several packages were evaluated using a common set of 110 single-project resource-constrained networks. The performance measure used was closeness to optimally minimum Total Durations. No package performed best on all problems. On average, the best produced schedules 5.2% longer than optimal, with 95 of 110 problems 0% to 10% above optimal, and values ranging from 0% to 35%. To describe software performance in terms of network characteristics, a linear regression model was proposed. A highly satisfactory fit was obtained using only 2 of the 58 network measures: SADUR (sum of all task duration) and ACONMX (resource constrainedness). Most project scheduling software is written and used assuming task durations have negligible variability, despite contrary industry experience. Rudimentary simulations examined solutions' robustness in a dynamic environment. The results indicate that actual projects will, on average, run longer than optimal deterministic schedules.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号