首页> 美国政府科技报告 >Installation Restoration Program, Engineering Work Plan for Bioventing System, 7th Street BX Service Station
【24h】

Installation Restoration Program, Engineering Work Plan for Bioventing System, 7th Street BX Service Station

机译:安装恢复计划,生物环境系统工程工作计划,第7街BX服务站

获取原文

摘要

As part of an on-going Installation Restoration Program (IRP) at Eglin AFB, Florida a bioventing system will be constructed at the 7th Street BX Service Station. This is an Engineering Work Plan for installing the bioventing system. The objective of this bioventing system is to support on-going remediation efforts at the Service Station. Existing remedial system at the site includes a groundwater recovery and treatment system. This plan contains information concerning construction, installation, operation, maintenance, and monitoring of the bioventing system. The procedures to be employed for construction and specification are also included.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号