首页> 美国政府科技报告 >Water Quality Management of Bilge Wastes at Pearl Harbor, Hawaii
【24h】

Water Quality Management of Bilge Wastes at Pearl Harbor, Hawaii

机译:夏威夷珍珠港污水处理厂水质管理

获取原文

摘要

The Navy, requires a new method to collect and treat the bilge waste dischargedfrom U.S. Navy Ships. This thesis recommends an interim plan, which can be implemented in a relatively short time frame, and a permanent plan which will take several years to implement. Although a permanent solution is recommended, the focus of this thesis is on what can be done now (interim plan) to collect and treat the bilge waste. The interim plan calls for collection of the bilge waste using pump trucks and barges. The collected bilge waste would then be processed by an oil/water separator, with the separated oil being recycled. The nonoily, separator effluent would then be prefiltered and processed through a reverse osmosis unit.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号