首页> 美国政府科技报告 >Effects of Management Initiatives on the Costs and Schedules of DefenseAcquisition Programs. Volume 2. Analyses of Ground Combat and Ship Programs
【24h】

Effects of Management Initiatives on the Costs and Schedules of DefenseAcquisition Programs. Volume 2. Analyses of Ground Combat and Ship Programs

机译:管理举措对国防采购计划成本和进度的影响。第2卷。地面作战和船舶计划分析

获取原文

摘要

This two-volume paper examines trends in the outcomes (in terms of costs andschedules) of the acquisition programs for major weapon systems, and assesses the effectiveness of management initiatives in improving these outcomes. IDA analyzed a total of 116 major programs that included a mix of aircraft, tactical munitions, electronics/avionics, strategic missiles, satellites, vehicles, and ships. In Volume I of the paper, program outcomes are assessed by equipment type, by time period, by phase (development and production), and by type (new or modification). The initiatives assessed are prototyping, contract incentives, multi-year procurement, design-to-cost, dual-source competition, and total package procurement and fixed-price development. Volume II contains special analyses of ships and ground combat programs. The management initiatives that show the most promise for containing cost and schedule growth are prototyping, contract incentives, and multi-year procurement.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号