首页> 美国政府科技报告 >St. Stephen Powerhouse Fish Lift, Cooper River Rediversion Project, SouthCarolina: Hydraulic Model Investigation
【24h】

St. Stephen Powerhouse Fish Lift, Cooper River Rediversion Project, SouthCarolina: Hydraulic Model Investigation

机译:南斯卡罗利纳库珀河河流项目圣斯蒂芬动力鱼升降机:水力模型调查

获取原文

摘要

The St. Stephen Power Plant is located in Berkeley County, South Carolina,approximately 1.9 miles north of the town of St. Stephen. It is located in the rediversion canal connecting Lake Moultrie and the Santee River. Included in the project is a reinforced concrete fish lift structure located on the north side of the powerhouse. The present fish lift structure does not provide sufficient attraction flow in the tailrace area, where the desired numbers of fish are likely to be drawn into the fish lift system. Tests were conducted on a 1:25-scale model of the powerhouse, fish lift entrances, and downstream tail race canal. The purpose of the study was to investigate various alternatives to improve the fish attraction capabilities of the existing fish lift system. Walls were extended downstream from the original design fish lift to provide new entrance locations in areas more suitably located for fish attraction. The type 9 entrance modification is the recommended design. This modification provided for two fish entrances. The upstream entrance was located approximately 88 ft downstream of the present fish entrances, and the downstream entrance fish entrances at the bend of the north wing wall. Both entrances provided downstream flow along a wall leading to the entrance.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号