Natiional Shipbuilding Research Program. 1993 Ship Production Symposium. Paper No. 8: Network Scheduling Development in an MRP II Environment.

机译:国家造船研究计划。 1993年船舶生产研讨会。第8号文件:mRp II环境中的网络调度开发。

获取原文

摘要

Large manufacturing industries have been able to successfully reduce cost and cycle time through the use of Manufacturing Resource Planning (MRP II) systems and principles to control material flow and the production process. Ship construction can not be neatly classified as a manufacturing process. The complex relationships involved with the installation and activation of ship's systems more closely resembles a construction operation. Work of this type has traditionally been controlled through an activity based network scheduling system. However, MRP 11 principles offer numerous benefits for the shipbuilding industry. This paper discusses an approach to planning, scheduling, and management of ship construction which takes advantage of benefits from both approaches. By using both network scheduling and MRP II in an integrated scheduling system, a shipyard will be better able to plan and execute the ship construction process.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号