首页> 美国政府科技报告 >Post-Flashover Fires in Simulated Shipboard Compartments - Phase 3. Venting of Large Shipboard Fires.
【24h】

Post-Flashover Fires in Simulated Shipboard Compartments - Phase 3. Venting of Large Shipboard Fires.

机译:模拟船舶舱室中的闪络后火灾 - 第3阶段。大型船舶火灾的通风。

获取原文

摘要

As part of the Internal Ship Conflagration Control Project, post-flashover compartment fires were created in small and large scale shipboard compartments. The venting test series described in this report was an extension of earlier work which quantified the heat transfer characteristics from post-flashover fires in steel enclosures. The objective of the tests was to quantify the effects of venting a large fire, particularly natural venting and its effect on thermal insults. Tests were conducted both in a steel mock-up at NRL CBD and on board the NRL research test ship, ex-USS SHADWELL. Venting of both the fire compartment and adjacent spaces was investigated. As anticipated, large vent areas are required to achieve significant reductions in the thermal insult to spaces adjacent to the fire compartment. Smaller vents may be effective in relieving smoke, which could help firefighters gain access to the fire. Mechanical ventilation, in the form of a portable water motor fan, was demonstrated to be more effective than natural venting for relieving heat in a compartment adjacent to a fire.... Heat venting, Natural ventilation, Water motor fan, Post-flashover fire, Fire model, Shipboard firefighting, Marine fire protection, Fire test.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号