首页> 美国政府科技报告 >Engineering Design, Construction, Operation, and Maintenance for the 7-Ohm Lineand Relativistic Klystron Facilities
【24h】

Engineering Design, Construction, Operation, and Maintenance for the 7-Ohm Lineand Relativistic Klystron Facilities

机译:7欧姆线和相对论速调管设施的工程设计,建造,运营和维护

获取原文

摘要

SFA designed, built, installed, operated, and maintained special-purposeequipment and fixtures in support of experimental research in high-power RF radiation and particle acceleration. Specifically, SFA personnel designed and fabricated hardware for experimental application of the 7-Ohm line generator, modulated intense relativistic electron beams (IREBs); constructed magnetic field coils and low-voltage, high-energy capacitor banks; upgraded the relativistic klystron facility; and designed and fabricated a relativistic klystron amplifier.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号