首页> 美国政府科技报告 >PART I: Bioventing Pilot Test Work Plan for Building 30, Above ground Soil Pile, and POL Storage Area Sites, Offutt AFB, Nebraska. PART II: Draft Interim Pilot Test Results Report for Building 30 and POL Storage Area, Offutt AFB, Nebraska
【24h】

PART I: Bioventing Pilot Test Work Plan for Building 30, Above ground Soil Pile, and POL Storage Area Sites, Offutt AFB, Nebraska. PART II: Draft Interim Pilot Test Results Report for Building 30 and POL Storage Area, Offutt AFB, Nebraska

机译:第一部分:内布拉斯加州奥夫特空军基地的30号楼,地上土桩和pOL储存场地的生物风化试验工作计划。第二部分:内布拉斯加州奥夫特空军基地30号楼和pOL储存区临时试点测试结果报告草案

获取原文

摘要

This work plan presents the scope of enhanced biological degradation, or 'bioventing', pilot tests for treatment of fuel-contaminated soils at three sites located at Offutt Air Force Base, Omaha, Nebraska. At two sites, Building 30, and the petroleum, oils, and lubricants (POL) storage area, in situ pilot tests will be performed. At the third site, an aboveground bioventing pilot test will be performed in a test cell constructed using soils previously excavated from the POL area. The pilot tests have three primary objectives: (1) to assess the potential for supplying oxygen throughout the contaminated soil interval, (2) to determine the rates at which indigenous microorganisms will degrade fuel when stimulated by oxygen-rich soil gas, and (3) to evaluate the potential for sustaining these rates of biodegradation until fuel contamination in the soil is remediated to concentrations below regulatory standards.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号