首页> 美国政府科技报告 >O&M Effort for the Bioventing System at the 7th Street BX Service Station (May 1992 through March 1993), Eglin, AFB
【24h】

O&M Effort for the Bioventing System at the 7th Street BX Service Station (May 1992 through March 1993), Eglin, AFB

机译:第7街BX服务站(1992年5月至1993年3月)生物环境系统的运行和维护工作,埃格林,空军基地

获取原文

摘要

Operation and maintenance (O&M) effort since installation of the bioventing system in May 1992 has included a check on each of the bioventing system components (i.e., blower, gauges, air filter, vapor extraction wells, and injection trenches) to evaluate operating status and to make adjustment where appropriate or necessary. The O&M effort also involved measurement of the following physical parameters: (1) Temperature at both blower suction and exhaust; (2) (3) Head loss through filter; and Pressure at Blower exhaust.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号