首页> 美国政府科技报告 >Part I: Bioventing Pilot Test Work Plan for Former Fire Training Area (FT-13) Kirtland AFB, New Mexico. Part II: Draft Interim Pilot Test Results Report for Former Fire Training Area (FT-13) Kirtland AFB, New Mexico
【24h】

Part I: Bioventing Pilot Test Work Plan for Former Fire Training Area (FT-13) Kirtland AFB, New Mexico. Part II: Draft Interim Pilot Test Results Report for Former Fire Training Area (FT-13) Kirtland AFB, New Mexico

机译:第一部分:新墨西哥州Kirtland空军基地的前消防训练区(FT-13)的生物风险试验工作计划。第二部分:新墨西哥州Kirtland空军基地的前消防训练区(FT-13)临时试点测试结果报告草案

获取原文

摘要

This work plan presents the scope of an in situ bioventing pilot test for treatment of fuel-contaminated soils at the former fire training area at Kirtland Air Force Base (AFB), New Mexico. The pilot test has three primary objectives: (1) to assess the potential for supplying oxygen throughout the contaminated soil interval, (2) to determine the rate at which indigenous microorganisms will degrade fuel when stimulated by oxygen-rich soil gas, and (3) to evaluate the potential for sustaining these rates of biodegradation until fuel contamination is remediated to concentrations below regulatory standards. The pilot test will be conducted in two phases. A vent well (VW) and monitoring points (MPs) will be installed during site investigation activities. The initial stage will also include an in situ respiration test and an air permeability test. This initial testing is expected to take approximately 2 weeks. During the second phase, a pilot bioventing system will be installed and monitored over a 1-year period.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号